Soil Drying and Quays Construction, Haifa Port

Client: Ministry of Defense/Solel Boneh
Year: 2010 – 2013
Location: Haifa Port

Construction of Sub-marine harbor in Haifa for the Israeli Navy.

The work included dredging 350,000 c.m Filling and drying an
area of 60,000 sq.mt.
Soil Tightening by Vibrocompaction method.
Driving 260 piles o.d. 1mt. to create 3 quays 100 mt. long each.
Installation of precast elements, heaviest were 85 ton.
Driving sheet pile walls and casting wall beams on site- 500 mt.